What are the major maintenance projects for SF6 circuit breakers?

Class:


【description】What are the major maintenance projects for SF6 circuit breakers? Generally, the following tests are required after major repairs: 1. Measure insulation resistance; Measure the resistance of each phase's conductive circuit; 3. AC voltage withstand test; 4. Testing of circuit breakers and equalizing capacitors; Measure the opening and closing time of the circuit breaker; Measure the opening and closing speed of the circuit breaker; 7...

What are the major maintenance projects for SF6 circuit breakers?

Generally, the following tests are required after major repairs:

1. Measure insulation resistance;

2.Measure the resistance of each phase's conductive circuit;

3. AC voltage withstand test;

4. Testing of circuit breakers and equalizing capacitors;

Measure the opening and closing time of the circuit breaker;

Measure the opening and closing speed of the circuit breaker;

Measure the synchronicity and coordination time of the opening and closing of the main and auxiliary contacts of the circuit breaker;

Measure the input time and resistance value of the circuit breaker closing resistance;

Measure the insulation resistance and DC resistance of the opening and closing coils of the circuit breaker;

Test of 10 circuit breaker operating mechanism;

Test of 11 bushing current transformers;

Measure the moisture content of SF6 gas inside the circuit breaker;

13 Sealing test;

Inspection of 14 gas density relays, pressure gauges, and pressure operated valves.